top of page

Monument Installation

The removal and installation of the Angel Moroni Monument for The Church of Jesus Christ of Latter-day Saints located in Bloomfield Hills, Michigan

Project Overview: The removal and installation of the Angel Moroni Monument for The Church of Jesus Christ of Latter-day Saints located in Bloomfield Hills, Michigan, has been successfully completed. This project, which involved intricate planning, coordination, and execution, was undertaken to ensure the preservation and relocation of this cherished symbol of faith and heritage within the community.

Scope of Work:

  1. Efficient Project Management: A dedicated project management team oversaw all aspects of the project, including scheduling, resource allocation, budget management, and stakeholder communication. Clear milestones and deliverables were established and successfully achieved.

  2. Expert Labor Coordination: Experienced laborers and technicians were engaged to handle the physical removal and installation of the Angel Moroni Monument. Their specialized skills and equipment ensured the safe and careful handling of the monument throughout the process.

  3. Precise Crane Lift Coordination: Certified crane operators executed controlled lifts with precision and accuracy, following established safety protocols and industry standards. The use of a crane for the removal and installation was carefully coordinated to ensure the safety of personnel and surrounding structures.

  4. Effective Logistics Planning: Comprehensive logistics planning facilitated the transportation of equipment, materials, and personnel to and from the project site. Considerations such as traffic management, site access, and material handling were carefully addressed to minimize disruptions and delays.

  5. Thorough Site Preparation: Prior to the commencement of work, the project site was meticulously prepared to accommodate the removal and installation activities. This included clearing obstructions, establishing safety barriers, and securing necessary permits and approvals from local authorities.

  6. Careful Monument Handling: The Angel Moroni Monument was handled with the utmost care and respect throughout the removal and installation process. Protective measures were implemented to prevent damage or degradation to the monument during transportation, lifting, and repositioning.

  7. Stringent Safety Measures: Stringent safety measures were implemented to protect the health and well-being of all personnel involved in the project. Adherence to relevant safety regulations and guidelines ensured a safe working environment at all times.

  8. Community Engagement: Transparent communication and collaboration with the local community and stakeholders were maintained throughout the project. Regular updates and outreach efforts addressed concerns and inquiries, fostering a sense of inclusivity and cooperation.

Conclusion: The successful removal and installation of the Angel Moroni Monument for The Church of Jesus Christ of Latter-day Saints in Bloomfield Hills, Michigan, represents a significant achievement. Through meticulous planning, expert coordination, and dedicated teamwork, the project was completed with the utmost professionalism and efficiency. The relocation of this iconic symbol ensures its continued significance within the community for generations to come.

Installation

Type

Church

Market

bottom of page